Heavy Duty Loaders for Stone Mining
Heavy Duty Loaders for Stone Mining have outstanding advantages and characteristics. Its high load-bearing capacity and stable structure can easily cope with the loading requirements of various stone blocks and ensure safe operation. It has strong adaptability and can handle stones of different sizes and weights, allowing flexible handling and improving work efficiency. The durable design ensures long-term stable operation in harsh environments, easy operation, and complete safety devices, providing reliable protection for mining operations. The overall design is energy-saving and environmentally friendly, making it an indispensable choice in the field of stone mining.
Product Parameter
|
Rated power |
199KW |
|
Overall length |
9900mm |
|
Overall width |
3300mm |
|
Overall height |
3900mm |
|
Dumping height |
3600mm |
|
Specification of tire |
29.5-25 |
|
Wheel base |
4400mm |
|
Tread width |
2700mm |
|
Fork dimensions L*W*H |
1700*350*120mm |
|
Distance of fork |
≤820mm |
|
Operating weight |
35000kgs |
|
Rated loading capacity |
32t |
|
Maximum load |
35t(1800mm) |
|
Max.climbing Gradient |
28° |
|
Rated speed |
2200r/min |
|
Lifting time |
≤6.8s |
|
Hydraulic cylinder time |
≤12.55s |
|
Travel speed |
|
|
Forward gear I |
11.5km/h |
|
Forward gear II |
38km/h |
|
Reserve gear I |
16km/h |
Product Feature And Application


After a loader leaves the factory, there is generally a running-in period of about 60 hours (some are called a run-in period), which is based on the technical characteristics of the loader at the initial stage of use.
The running-in period is an important step to ensure the normal operation of the loader, reduce the failure rate, and extend its service life. Some users ignore the special technical requirements of the new machine's running-in period due to a lack of common sense in using loaders, tight construction schedules, or wanting to obtain benefits as soon as possible. Some users even believe that the manufacturer has a warranty period anyway, and the manufacturer is responsible for repairing the machine if it breaks down.
Therefore, the Heavy Duty Loaders for Stone Mining is overloaded for a long time during the running-in period, resulting in frequent early failures. This not only affects the normal use of the machine but also affects the normal use of the machine. The service life of the machine is shortened, and the project progress is also affected due to machine damage. Therefore, full attention should be paid to the application and maintenance of the loader during the running-in period.


Manufacturers customize loaders, excavators, air compressors for stone mining. Please consult sales consultants for details of various tonnages.
Hot Tags: heavy duty loaders for stone mining, China heavy duty loaders for stone mining manufacturers, suppliers, factory, Stone Mining Equipment, , , Granite Splitting Machine, Cutting Granite Blade
Next
No InformationYou Might Also Like
Send Inquiry





















