How to prepare before installing the double-blade mining cutter?
To install the double-blade mining cutter, we need to make the following preparations:
1. Mine leveling, use a diamond wire saw machine and down-the-hole drill to level the protruding areas
2. Track installation, be sure to confirm the wheelbase when installing the track. The double-blade mining cutter has two wheelbases of 1140mm and 1900mm. The wheelbase of RS4600 and above is 1900mm. The track must be laid flat and padded with triangular wood, and each section of the track must be locked with screws.
3. Prepare cables, water pipes, and saw blades.
4. Use a forklift to move the double-blade mining cutter to the track
5. Install the saw blade
6. Connect the power supply and water pipes
7. Start the machine for trial operation

If you have any questions during installation and use, please contact us at any time